{"id":810,"date":"2015-11-05T09:40:36","date_gmt":"2015-11-05T08:40:36","guid":{"rendered":"http:\/\/www.zkp.at\/en\/?page_id=810"},"modified":"2015-11-05T09:46:58","modified_gmt":"2015-11-05T08:46:58","slug":"activities","status":"publish","type":"page","link":"https:\/\/www.zkp.at\/en\/activities\/","title":{"rendered":"Activities"},"content":{"rendered":"<p>Ensuring a complete assistance and processing for complex building projects ZKP ZT GmbH with team offers following technical activities:<\/p>\n<div class=\"taetigkeiten_entry\"><img decoding=\"async\" src=\"https:\/\/www.zkp.at\/wp-content\/uploads\/2015\/07\/beratung.jpg\"><div class=\"taetigkeiten_content\"><h2>CONSULTING<\/h2>Conceptual Design<\/p>\n<p>Feasibility Studies<\/p>\n<p>Studies of Alternatives<\/p>\n<p>Preliminary and General Projects<\/p>\n<p>Estimates of Costs<\/div><div style=\"clear:both;\"><\/div><\/div><div style=\"clear:both;\"><\/div>\n<div class=\"taetigkeiten_entry\"><img decoding=\"async\" src=\"https:\/\/www.zkp.at\/wp-content\/uploads\/2015\/07\/planung-200.jpg\"><div class=\"taetigkeiten_content\"><h2>DESIGN<\/h2>General Layout<\/p>\n<p>Official Approvals for Water-, Conservation-, Road- und Railway Infrastructure Projects<\/p>\n<p>Tendering<\/p>\n<p>Environmental Sustainability<\/p>\n<p>Detail Design for Steel-, Reinforced Concrete and Composite Structures<br \/>\n(Formwork-, Reinforcement and Working Drawings)<\/p>\n<p>Design for Superstructure<br \/>\n<span style=\"color: #ff0000;\">(u.A. xxxxxxxxxxx)<\/span><\/p>\n<p><span style=\"color: #ff0000;\">Planung von Sanierungen, Erweiterungen und Verst\u00e4rkungen<\/span><\/p>\n<p>Industrial and Bridge Projects<\/p>\n<p>Topics in structural analysis for:<\/p>\n<h6>Dynamic analysis<br \/>\nFire analysis<br \/>\nFatigue analysis<br \/>\nEarthquake analysis with capacity DCM, DCH and base isolation<br \/>\n<span style=\"color: #ff0000;\">Analysis for gantry girders, stacks, silo etc., As-Completed Drawings.<\/span><\/h6>\n<p>As-Completed Drawings<\/div><div style=\"clear:both;\"><\/div><\/div><div style=\"clear:both;\"><\/div>\n<div class=\"taetigkeiten_entry\"><img decoding=\"async\" src=\"https:\/\/www.zkp.at\/wp-content\/uploads\/2015\/07\/Pruefung.jpg\"><div class=\"taetigkeiten_content\"><h2>TESTING<\/h2>Controlling<\/p>\n<p>Approvals in factory and on site\u00a0(reinforcement and steelwork approvals)<\/p>\n<p>checks for external working drawings\u00a0(e.g. steelwork drawings of steelwork companies)<\/p>\n<p>Approvals for external structural calculations, structure and as-completed checks on site<\/p>\n<\/div><div style=\"clear:both;\"><\/div><\/div><div style=\"clear:both;\"><\/div>\n<div class=\"taetigkeiten_entry\"><img decoding=\"async\" src=\"https:\/\/www.zkp.at\/wp-content\/uploads\/2015\/07\/bauaufsicht-200.jpg\"><div class=\"taetigkeiten_content\"><h2>PROJECT AND SITE SUPERVISION<\/h2>\n<p>Representation of clients on site according to all contracts, inspection according to building work in conformity with detail planning, compliance with legal and prescript rules, technical rules, time schedules, local coordination of all supplies and construction works, management and recording on site as well as keep the accounts and final approvals for complete structure work.<br \/>\nControlling of allowances for accounting, controlling of progress and final payment, accompanying trials with successful tenderers we offer.<\/p>\n<\/div><div style=\"clear:both;\"><\/div><\/div><div style=\"clear:both;\"><\/div>\n<div class=\"taetigkeiten_entry\"><img decoding=\"async\" src=\"https:\/\/www.zkp.at\/wp-content\/uploads\/2015\/07\/stempel-200.jpg\"><div class=\"taetigkeiten_content\"><h2>EXPERT REPORTS<\/h2>DI Dr.techn. Welf Zimmermann and Dipl. Ing. Dr.techn. Stefan Kuss are registered in expert justice list of Austrian Association of Common Oath Certified Experts. The areas of expertise range from structural work and design to metal constructions range from bridge building to road and railway infrastructures companying vibration technology. Mr. Zimmermann wrote more than 500 reports in different sectors.<\/div><div style=\"clear:both;\"><\/div><\/div><div style=\"clear:both;\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Ensuring a complete assistance and processing for complex building projects ZKP ZT GmbH with team offers following technical activities:<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-810","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.zkp.at\/en\/wp-json\/wp\/v2\/pages\/810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zkp.at\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.zkp.at\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.zkp.at\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zkp.at\/en\/wp-json\/wp\/v2\/comments?post=810"}],"version-history":[{"count":4,"href":"https:\/\/www.zkp.at\/en\/wp-json\/wp\/v2\/pages\/810\/revisions"}],"predecessor-version":[{"id":812,"href":"https:\/\/www.zkp.at\/en\/wp-json\/wp\/v2\/pages\/810\/revisions\/812"}],"wp:attachment":[{"href":"https:\/\/www.zkp.at\/en\/wp-json\/wp\/v2\/media?parent=810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}